Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13637906

- Product Categories
- Friendly Links
Information Name: | Chongqing epoxy paint |
Published: | 2015-01-07 |
Validity: | 360 |
Specifications: | Two-component |
Quantity: | 10000.00 |
Price Description: | |
Detailed Product Description: | Epoxy paint wholesale; Chongqing epoxy paint factory (in 2015 we work together) design a variety of anti-corrosion coating solutions for the customer! Chongqing epoxy paint; epoxy floor paint; epoxy primers; epoxy paint; epoxy intermediate coat; Division crown paint company; to deliver quality and good after-sales engineering into your hands! Epoxy floor coatings, has the following outstanding features: a strong adhesion: the grassroots: Adhesion (such as concrete, brick, stone, tile) super, even though construction in tile, stone surface is difficult to scoop up, not from the shell. 2, high strength and abrasion resistance: high surface strength, abrasion resistance particularly strong. 3, will not fade: uniform color bright, very easy to fade. Even in the outdoors (in the water and ultraviolet erosion) is relatively hard to change color. 4, the amount of State: In the fierce competition in today's market price, the amount of the province, for the construction enterprises is particularly important, if the amount per square meter of the very provincial, was able to complete high quality floor, then the material costs will be greatly reduced , and undoubtedly increases the competitiveness. For example: In the wear-resistant flooring and terrazzo construction material per square meter only 0.7 to 1.0 kg can be completed. On poor concrete construction, but also just 0.6 to 0.8 kg material can be completed. Just this point, it has a very strong market competitiveness. 5, easy construction, simple ingredients: Materials used throughout simply A, B two products, without the other with curing agents, diluents. Specific Usage: A primer materials; putty and mortar in the coating layer: The material A, B in proportion with the material, and quartz powder or quartz sand to stir construction; topcoat will be A, B can be scaled with the construction; Finally add a layer of armor overlay to enhance wear resistance, scrub, easy to clean, and increased functionality such as UV epoxy paint Chongqing construction process step one, primary treatment: 1, clean up and test the moisture content of the grass-roots: the dissection grassroots floating dust and impurities, such as cement pimple clean, grease the ground attached to the solvent to wipe clean the impurities; Determination of ground moisture with a moisture meter, moisture meter can be used if there is no simple way around that is to use a piece of transparent PE film 1㎡ tiled floor , surrounded by tape sealing, such as see to be within 2-4 hours after the film has a fogging phenomenon indicates that the high water content, not construction, on the contrary, you can construction; 2, grinding grassroots: grassroots cleared a large area with polished Machine sanding floors, floor to make more smooth, but also the gross floor was beaten more adhesion, small size and irregular places available grinder or sandpaper to polish; 3, grassroots putty repair: basic level grinding is completed, as found to have a large local area (over 0.5㎡ more) below the floor surface Omo available epoxy floor paint plus quartz powder modulated into putty to fill the concave flat; 4, caulking job with epoxy floor quartz powder paint plus modulated into putty to fill the floor construction joints Step one, primary treatment: 1, clean up and test the moisture content of the grass-roots: The cleaned grassroots floating ash and impurities, such as cement lumps, ground attached to the solvent wipe grease contaminants clean; see, for example after the ground moisture measurement with a moisture meter, moisture meter if no simple method that can be used with a piece of transparent PE film about 1㎡ tiled floor, surrounded by tape sealing, wait 2-4 hours with the knots within the film fog phenomenon indicates that the high water content, not construction, on the contrary, you can construction; 2, grinding grassroots: grassroots cleared a large area with a sander sanding floors, floor to make more smooth, but also the gross floor beaten more place has adhesion, small area and irregular angle grinder or sandpaper available polished; 3, grassroots putty repair: grassroots polished finish, the local area if there is a large (more than 0.5㎡ more) below the floor surface Omo available epoxy floor paint plus quartz powder modulated into putty to fill the concave flat; 4, caulk job modulated with epoxy floor paint plus quartz powder into putty to fill the floor construction joints; step two primer Painting: Floor sanding is complete and partial order after patch formation, when the dust caused by sanding clean sweep, and then you can carry on a roll or split scratch epoxy primer material penetration, the material in the correct proportions with a good stir, covered with a long-handled roller mix evenly on the base or ground cover substrate chop chopper overall. Epoxy sealer has a strong permeability. Penetration primer and base coat adhesion enhancement, its coating must be continuous, without interruption, to the surface of the coating amount, whichever is just saturated. Step Three Epoxy putty: After the quartz sand drying and curing, you can scratch the coating epoxy putty, epoxy and silicon powder with epoxy putty modulated into the gap as much as possible covered with epoxy putty make the surface smooth. Step four, epoxy floor coating a surface, the surface layer of polish: After drying putty molding, with the angle grinder or sandpaper to polish over the entire floor again, putty scraper scratch marks when you want to polish off In addition, excess epoxy polished smooth sand and raised at the benefit under again brushing finish: 2, roller surface: putty sanding and sweeping clean, can be on the finish, which uses epoxy resin with a good finish in proportion and stir evenly with a lint roller over painted together in this way and do not pay attention to holidays, special parts can not be painted with a roller brush wool local brushing; 3, epoxy artesian plane layer : In order to meet the requirements of wearable aesthetic expression product performance; use special trowel floor diffuse evenly coated construction, after 24-36 hours, confirm the curing conditions; |
Admin>>>
You are the 18802 visitor
Copyright © GuangDong ICP No. 10089450, Crown Paint Co., Ltd. Chongqing Branch All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 18802 visitor
Copyright © GuangDong ICP No. 10089450, Crown Paint Co., Ltd. Chongqing Branch All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility